Please reload

Recent Posts

Valtech Engineering Awarded Major FCCU Expansion Joint Contract

January 26, 2020

1/1
Please reload

Featured Posts

Valtech Engineering builds (2) 60.0" hot wall flue expansion joints

August 10, 2016

Valtech builds (2) 60.0" ID hot wall flue gas expansion joints for major Indiana refinery.  45 psig at 1350 F.  
1.0 inch thick 304H stainless expanded ducting with floating hardware.  The first joint was a universal gimbal and the second joint was a single hinge with a hot wall manway and a hot to cold wall conic transition.

 

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Follow Us

I'm busy working on my blog posts. Watch this space!

Please reload

Search By Tags