Valtech Engineering completes online install at Texas Refinery
A major US refinery contacted Valtech Engineering reporting failure in a universal type expansion joint on the flue gas cooler piping. To avoid a costly outage the repair needed to be performed while the unit remained online and last two years until the next scheduled shut down.
