Glowing Hot online clamshell completed
Valtech Engineering's amazing field service crew completes a difficult installation for a major Houston area refinery. This job was performed online with duct at 1200 F which you can see in the photos. The external gimbal box was completely removed and a new over sized gimbal was installed. 6 purge nozzles had to be avoided on this 67.0 inch part and the job took 8 days.


Fastrack refurb of 48" universal hot wall gimbal
Valtech Engineering refurbished a universal gimbal with floating hardware for a Gulf coast refinery. The joint was designed for 50 psig at 1300 F with A240-316H ducting. The joint was shipped from Corpus Christi to our plant in Montreal and refurbished in five days. New two ply bellows and internals were installed, the joint was pressure tested, then it was sent back for installation during the turnaround.