FOLLOW US
  • LinkedIn Social Icon
24/7 EMERGENCY LINE

1-619-599-8209

Call Office

1-888-372-2205

  • Home

  • News

  • Company

    • About Us
    • Team
    • Engineering
    • Manufacturing
    • Field Services
  • VGOC - Valtech group of companies

  • Contact Us

  • More

    Use tab to navigate through the menu items.
    LATEST NEWS
    Valtech Engineering builds (2) 36.0" pressure balanced "Y" flasher expansion joints

    Valtech Engineering builds (2) 36.0" pressure balanced "Y" flasher expansion joints

    Valtech Engineering ships (2) 36.0" pressure balanced Y expansion joints to a major West coast refinery. 810 F at FV / 40 psig . Features 317L stainless steel wetted surfaces, two ply testable, three vanstone flanges and axial preset.
    Featured Posts
    Valtech Engineering Awarded Major FCCU Expansion Joint Contract

    Valtech Engineering Awarded Major FCCU Expansion Joint Contract

    Recent Posts
    Refinery Turnaround Video Testimonial

    Refinery Turnaround Video Testimonial

    Large Double Gimbal, Tied Elbow and Tied Universal

    Large Double Gimbal, Tied Elbow and Tied Universal

    In-Line Pressure Balanced Cat Cracker with Gimbaled Pantograph

    In-Line Pressure Balanced Cat Cracker with Gimbaled Pantograph

    VE Field Services Repair Leaking FCC Expansion Joint Online

    VE Field Services Repair Leaking FCC Expansion Joint Online

    Valtech Engineering Awarded Major FCCU Expansion Joint Contract

    Valtech Engineering Awarded Major FCCU Expansion Joint Contract

    Large Cold Wall Crossover

    Large Cold Wall Crossover

    Leaking Joint in Spain Repaired On-Line

    Leaking Joint in Spain Repaired On-Line

    Bolted Root Ring Field Install (R stamp)

    Bolted Root Ring Field Install (R stamp)

    Two Joints Ship to Saudi Arabia

    Two Joints Ship to Saudi Arabia

    Anacortes Washington Gets Four Large EJ's

    Anacortes Washington Gets Four Large EJ's

    Archive
    • June 2021 (1) 1 post
    • April 2021 (2) 2 posts
    • February 2020 (1) 1 post
    • January 2020 (1) 1 post
    • May 2019 (1) 1 post
    • April 2019 (1) 1 post
    • April 2018 (1) 1 post
    • February 2018 (1) 1 post
    • January 2018 (2) 2 posts
    • October 2017 (1) 1 post
    • June 2017 (1) 1 post
    • May 2017 (2) 2 posts
    • January 2017 (1) 1 post
    • December 2016 (1) 1 post
    • August 2016 (2) 2 posts
    • December 2015 (1) 1 post
    • November 2015 (1) 1 post
    • June 2015 (1) 1 post
    • March 2015 (2) 2 posts
    • January 2015 (1) 1 post
    Search By Tags
    No tags yet.
    Follow Us
    • LinkedIn Social Icon
    ISN RAVS Plus Participant Logo.jpg

    © 2021 Valtech